Zundara·Companies on offerCall us0330 027 2159
Private medical / NHS GP practice · CQC and NHS application-ready

Ashgrove Medical Practice

A complete, CQC and NHS application-ready GP medical practice. Modelled on a list growing from 2,000 to 5,400 patients over three years. NHS contract-backed revenue. 314-document operating pack.

Company status
UK Limited — registered
Documents
314
Categories
12
Image previews
14
Live website
What is included on day one

Everything you need to start trading.

Business email
@ashgrovemedical.co.uk
Email accounts on the company domain — configured and ready.
Business phone
UK number
With call routing, voicemail, and customer-facing greeting.
Registered UK Limited Company
Companies House registered
Transferred into your name on handover.
Policies & Procedures
85 documents
The compliance backbone — the keyword every operator searches for.
Operational
35 documents
Day-to-day operating procedures, checklists, and runbooks.
Human Resources
32 documents
Contracts, recruitment pack, onboarding, training, performance.
Financial
31 documents
Six financial models, budgeting, forecasting, accounting templates.
Regulatory & Compliance
25 documents
Sector registration pack, compliance matrix, supporting evidence.
Information Governance
20 documents
GDPR, data protection, record retention, IG toolkit.
OctusCloud infrastructure
£150/mo
Email, web, phone, document management, platform support from handover.
Zundara strategic partnership
12% retained
You operate. We are alongside for as long as the venture exists.

Plus the full 314-document operating pack across 12 categories — browse the full library below.

About this company

NHS primary care — structurally undersupplied, contract-backed revenue.

Ashgrove is a general practice modelled on a registered patient list growing from 2,000 to 5,400 over three years. It delivers NHS primary care services: consultations, chronic disease management, immunisations, minor procedures, QOF clinical work, and Enhanced Services.

Revenue comes from NHS England: Global Sum (~£123 per weighted patient), Quality and Outcomes Framework (QOF), Enhanced Services, premises cost reimbursement, and private services. Multiple revenue streams provide resilience; Global Sum scales directly with list size.

The UK has a structural shortage of GP practices. NHS England actively encourages new providers and supports list growth. The infrastructure, documentation, and financial modelling needed to apply for a GMS or APMS contract and register with CQC is prepared and included.

Key numbers
Year 2 revenue (modelled)
£804,924
NHS contracted
OctusCloud infrastructure
£150
Per month, heavy-regulatory tier
Zundara strategic stake
12%
You operate the business
Document library · 314 files in 12 categories

What you get on day one.

Click a preview thumbnail to view full page Documents without a preview are released at handover

Corporate & Legal

16 documents · 3 previewable
  1. A-000 Certificate of Incorporation
    .pdf v1.0 Preview
  2. A-001 Memorandum of Association
    Word Document v1.0 Preview
  3. A-002 Articles of Association
    Word Document v1.0 Preview
  4. A-003 Share Certificate 001
    Word Document v1.0 At handover
  5. A-004 Register of Members
    Word Document v1.0 At handover
  6. A-005 Register of Directors
    Word Document v1.0 At handover
  7. A-006 Register of PSC
    Word Document v1.0 At handover
  8. A-007 Register of Secretaries
    Word Document v1.0 At handover
  9. A-008 Minutes First Board Meeting
    Word Document v1.0 At handover
  10. A-009 Director Service Agreement
    Word Document v1.0 At handover
  11. A-010 Company Secretarial Calendar
    Word Document v1.0 At handover
  12. A-011 Register of Charges
    Word Document v1.0 At handover
  13. A-012 Shareholders Agreement
    Word Document v1.0 At handover
  14. A-013 Register Directors Residential Addresses
    Word Document v1.0 At handover
  15. A-014 Written Resolution Template
    Word Document v1.0 At handover
  16. A-015 Corporate Governance Framework
    Word Document v1.0 At handover

Regulatory & Compliance

25 documents · 1 previewable
  1. B-001 CQC Registration Application Summary
    Word Document v1.0 Preview
  2. B-002 Statement of Purpose
    Word Document v1.0 At handover
  3. B-003 Patient Information Leaflet
    Word Document v1.0 At handover
  4. B-004 CQC Registered Manager Application
    Word Document v1.0 At handover
  5. B-005 CQC Compliance Self Assessment — Safe
    Word Document v1.0 At handover
  6. B-006 CQC Compliance Self Assessment — Effective
    Word Document v1.0 At handover
  7. B-007 CQC Compliance Self Assessment — Caring
    Word Document v1.0 At handover
  8. B-008 CQC Compliance Self Assessment — Responsive
    Word Document v1.0 At handover
  9. B-009 CQC Compliance Self Assessment — Well Led
    Word Document v1.0 At handover
  10. B-010 CQC Notification Procedures
    Word Document v1.0 At handover
  11. B-011 Fit and Proper Persons Declaration
    Word Document v1.0 At handover
  12. B-012 NHS Performer List Application Guide
    Word Document v1.0 At handover
  13. B-013 GMS Contract Application Guide
    Word Document v1.0 At handover
  14. B-014 PCN Membership Agreement Framework
    Word Document v1.0 At handover
  15. B-015 Regulatory Compliance Calendar
    Word Document v1.0 At handover
  16. B-016 CQC Annual Self Assessment Framework
    Word Document v1.0 At handover
  17. B-017 ICO Registration and Data Protection Compliance
    Word Document v1.0 At handover
  18. B-018 GMC Revalidation and Appraisal Framework
    Word Document v1.0 At handover
  19. B-019 Clinical Governance Framework
    Word Document v1.0 At handover
  20. B-020 Controlled Drugs Accountable Officer Responsibilities
    Word Document v1.0 At handover
  21. B-021 Infection Prevention and Control Annual Statement
    Word Document v1.0 At handover
  22. B-022 Freedom to Speak Up Guardian Role
    Word Document v1.0 At handover
  23. B-023 Duty of Candour Compliance Framework
    Word Document v1.0 At handover
  24. B-024 Equality and Diversity Compliance Statement
    Word Document v1.0 At handover
  25. B-025 Practice Development Plan and Quality Improvement
    Word Document v1.0 At handover

Policies & Procedures

85 documents · 1 previewable
  1. C-001 Consent to Examination and Treatment Policy
    Word Document v1.0 Preview
  2. C-002 Confidentiality and Information Sharing Policy
    Word Document v1.0 At handover
  3. C-003 Chaperone Policy
    Word Document v1.0 At handover
  4. C-004 Clinical Record Keeping Policy
    Word Document v1.0 At handover
  5. C-005 Patient Identification and Verification Policy
    Word Document v1.0 At handover
  6. C-006 Referral Management Policy
    Word Document v1.0 At handover
  7. C-007 Prescribing Policy and Practice Formulary
    Word Document v1.0 At handover
  8. C-008 Repeat Prescribing Policy
    Word Document v1.0 At handover
  9. C-009 Controlled Drugs Policy
    Word Document v1.0 At handover
  10. C-010 Antimicrobial Stewardship Policy
    Word Document v1.0 At handover
  11. C-011 Vaccination and Immunisation Policy
    Word Document v1.0 At handover
  12. C-012 Cold Chain Management Policy
    Word Document v1.0 At handover
  13. C-013 Medical Emergency and Anaphylaxis Policy
    Word Document v1.0 At handover
  14. C-014 Safeguarding Children Policy
    Word Document v1.0 At handover
  15. C-015 Safeguarding Adults Policy
    Word Document v1.0 At handover
  16. C-016 Mental Capacity Act Policy
    Word Document v1.0 At handover
  17. C-017 Medication Management Policy
    Word Document v1.0 At handover
  18. C-018 Infection Prevention and Control Policy
    Word Document v1.0 At handover
  19. C-019 Data Protection and GDPR Policy
    Word Document v1.0 At handover
  20. C-020 Complaints Policy
    Word Document v1.0 At handover
  21. C-021 Whistleblowing Policy
    Word Document v1.0 At handover
  22. C-022 Duty of Candour Policy
    Word Document v1.0 At handover
  23. C-023 Equality Diversity and Inclusion Policy
    Word Document v1.0 At handover
  24. C-024 Business Continuity Plan
    Word Document v1.0 At handover
  25. C-025 Lone Working Policy
    Word Document v1.0 At handover
  26. C-026 Environmental and Sustainability Policy
    Word Document v1.0 At handover
  27. C-027 Modern Slavery and Human Trafficking Statement
    Word Document v1.0 At handover
  28. C-028 Information Security Policy
    Word Document v1.0 At handover
  29. C-029 Records Management Policy
    Word Document v1.0 At handover
  30. C-030 Training and Development Policy
    Word Document v1.0 At handover
  31. C-031 Clinical Governance Policy
    Word Document v1.0 At handover
  32. C-032 Significant Event Analysis Policy
    Word Document v1.0 At handover
  33. C-033 Clinical Audit Policy
    Word Document v1.0 At handover
  34. C-034 Patient Safety Incident Reporting Policy
    Word Document v1.0 At handover
  35. C-035 Risk Management Policy
    Word Document v1.0 At handover
  36. C-036 Access and Appointments Policy
    Word Document v1.0 At handover
  37. C-037 Telephone Consultation and Triage Policy
    Word Document v1.0 At handover
  38. C-038 Home Visit Policy
    Word Document v1.0 At handover
  39. C-039 Out of Hours Arrangements Policy
    Word Document v1.0 At handover
  40. C-040 Results Handling and Communication Policy
    Word Document v1.0 At handover
  41. C-041 Clinical Correspondence Management Policy
    Word Document v1.0 At handover
  42. C-042 Diabetes Management Policy
    Word Document v1.0 At handover
  43. C-043 Hypertension Management Policy
    Word Document v1.0 At handover
  44. C-044 Asthma Management Policy
    Word Document v1.0 At handover
  45. C-045 COPD Management Policy
    Word Document v1.0 At handover
  46. C-046 Heart Failure Management Policy
    Word Document v1.0 At handover
  47. C-047 Atrial Fibrillation Management Policy
    Word Document v1.0 At handover
  48. C-048 Chronic Kidney Disease Management Policy
    Word Document v1.0 At handover
  49. C-049 Thyroid Disease Management Policy
    Word Document v1.0 At handover
  50. C-050 Epilepsy Management Policy
    Word Document v1.0 At handover
  51. C-051 Dementia Assessment and Support Policy
    Word Document v1.0 At handover
  52. C-052 Depression and Anxiety Management Policy
    Word Document v1.0 At handover
  53. C-053 Serious Mental Illness Management Policy
    Word Document v1.0 At handover
  54. C-054 Learning Disabilities Annual Health Check Policy
    Word Document v1.0 At handover
  55. C-055 Palliative and End of Life Care Policy
    Word Document v1.0 At handover
  56. C-056 Cancer Referral Two Week Wait Policy
    Word Document v1.0 At handover
  57. C-057 Cervical Screening Policy
    Word Document v1.0 At handover
  58. C-058 Bowel Cancer Screening Policy
    Word Document v1.0 At handover
  59. C-059 Breast Screening Support Policy
    Word Document v1.0 At handover
  60. C-060 Childhood Immunisation Programme Policy
    Word Document v1.0 At handover
  61. C-061 Seasonal Influenza and COVID Vaccination Policy
    Word Document v1.0 At handover
  62. C-062 Travel Health Policy
    Word Document v1.0 At handover
  63. C-063 Minor Surgery Policy
    Word Document v1.0 At handover
  64. C-064 Family Planning and Contraception Policy
    Word Document v1.0 At handover
  65. C-065 Antenatal and Postnatal Care Policy
    Word Document v1.0 At handover
  66. C-066 Newborn and Child Health Surveillance Policy
    Word Document v1.0 At handover
  67. C-067 Carers Identification and Support Policy
    Word Document v1.0 At handover
  68. C-068 Veterans Health Policy
    Word Document v1.0 At handover
  69. C-069 Homeless and Vulnerable Patients Policy
    Word Document v1.0 At handover
  70. C-070 Patient Participation and Engagement Policy
    Word Document v1.0 At handover
  71. C-071 Complaints Management Procedure
    Word Document v1.0 At handover
  72. C-072 Freedom of Information Policy
    Word Document v1.0 At handover
  73. C-073 Social Media and Digital Communications Policy
    Word Document v1.0 At handover
  74. C-074 Smoking Cessation Service Policy
    Word Document v1.0 At handover
  75. C-075 Alcohol and Substance Misuse Policy
    Word Document v1.0 At handover
  76. C-076 Obesity and Weight Management Policy
    Word Document v1.0 At handover
  77. C-077 Falls Prevention and Assessment Policy
    Word Document v1.0 At handover
  78. C-078 Continence Assessment and Management Policy
    Word Document v1.0 At handover
  79. C-079 Wound Care Management Policy
    Word Document v1.0 At handover
  80. C-080 Physiotherapy and MSK Referral Policy
    Word Document v1.0 At handover
  81. C-081 PCN Service Delivery Policy
    Word Document v1.0 At handover
  82. C-082 QOF Management Policy
    Word Document v1.0 At handover
  83. C-083 Enhanced Services Delivery Policy
    Word Document v1.0 At handover
  84. C-084 Document Management and Clinical Coding Policy
    Word Document v1.0 At handover
  85. C-085 Practice Development and Quality Improvement Policy
    Word Document v1.0 At handover

Operational

35 documents · 1 previewable
  1. D-001 Practice Operations Manual
    Word Document v1.0 Preview
  2. D-002 Appointment System Management
    Word Document v1.0 At handover
  3. D-003 Patient Registration Procedure
    Word Document v1.0 At handover
  4. D-004 Triage Protocol and Clinical Prioritisation
    Word Document v1.0 At handover
  5. D-005 Home Visit Policy and Procedure
    Word Document v1.0 At handover
  6. D-006 Repeat Prescribing Standard Operating Procedure
    Word Document v1.0 At handover
  7. D-007 Referral Management Protocol
    Word Document v1.0 At handover
  8. D-008 Results Handling and Communication
    Word Document v1.0 At handover
  9. D-009 Clinical Correspondence Management
    Word Document v1.0 At handover
  10. D-010 QOF Achievement Plan and Monitoring
    Word Document v1.0 At handover
  11. D-011 Enhanced Services Delivery Plan
    Word Document v1.0 At handover
  12. D-012 Chronic Disease Management Framework
    Word Document v1.0 At handover
  13. D-013 Diabetes Management Protocol
    Word Document v1.0 At handover
  14. D-014 Hypertension Management Protocol
    Word Document v1.0 At handover
  15. D-015 Asthma and COPD Management Protocol
    Word Document v1.0 At handover
  16. D-016 Mental Health Assessment and Management
    Word Document v1.0 At handover
  17. D-017 Cervical Screening Programme
    Word Document v1.0 At handover
  18. D-018 Childhood Immunisation Programme
    Word Document v1.0 At handover
  19. D-019 Learning Disabilities Annual Health Check
    Word Document v1.0 At handover
  20. D-020 Clinical Audit Programme
    Word Document v1.0 At handover
  21. D-021 Significant Event Analysis (SEA) Framework
    Word Document v1.0 At handover
  22. D-022 Out of Hours Arrangements
    Word Document v1.0 At handover
  23. D-023 Minor Surgery Service Protocol
    Word Document v1.0 At handover
  24. D-024 Travel Health and Vaccination Service
    Word Document v1.0 At handover
  25. D-025 Palliative and End of Life Care Protocol
    Word Document v1.0 At handover
  26. D-026 Safeguarding Children Operational Procedures
    Word Document v1.0 At handover
  27. D-027 Carers Identification and Support
    Word Document v1.0 At handover
  28. D-028 Patient Participation Group (PPG) Framework
    Word Document v1.0 At handover
  29. D-029 Practice Meeting Structure and Clinical Governance
    Word Document v1.0 At handover
  30. D-030 Emergency Equipment and Drugs Checking
    Word Document v1.0 At handover
  31. D-031 Cold Chain Management and Vaccine Storage
    Word Document v1.0 At handover
  32. D-032 Specimen Collection and Handling
    Word Document v1.0 At handover
  33. D-033 Medical Equipment Calibration and Maintenance
    Word Document v1.0 At handover
  34. D-034 Practice Development Plan
    Word Document v1.0 At handover
  35. D-035 Patient Safety Incident Response Framework (PSIRF)
    Word Document v1.0 At handover

Human Resources

32 documents · 1 previewable
  1. E-001 Staff Handbook
    Word Document v1.0 Preview
  2. E-002 GP Partner Agreement Template
    Word Document v1.0 At handover
  3. E-003 Salaried GP Employment Contract Template
    Word Document v1.0 At handover
  4. E-004 Practice Nurse Employment Contract Template
    Word Document v1.0 At handover
  5. E-005 Healthcare Assistant Contract Template
    Word Document v1.0 At handover
  6. E-006 Practice Manager Contract Template
    Word Document v1.0 At handover
  7. E-007 Admin Reception Staff Contract Template
    Word Document v1.0 At handover
  8. E-008 Locum GP Engagement Agreement
    Word Document v1.0 At handover
  9. E-009 Recruitment and Selection Policy
    Word Document v1.0 At handover
  10. E-010 Pre Employment Checks Procedure
    Word Document v1.0 At handover
  11. E-011 Induction Programme and Checklist
    Word Document v1.0 At handover
  12. E-012 Probationary Period Policy
    Word Document v1.0 At handover
  13. E-013 Mandatory Training Matrix
    Word Document v1.0 At handover
  14. E-014 CPD and Professional Development Policy
    Word Document v1.0 At handover
  15. E-015 Clinical Supervision Framework
    Word Document v1.0 At handover
  16. E-016 Annual Appraisal Policy and Procedure
    Word Document v1.0 At handover
  17. E-017 Performance Management Policy
    Word Document v1.0 At handover
  18. E-018 Disciplinary Policy and Procedure
    Word Document v1.0 At handover
  19. E-019 Grievance Policy and Procedure
    Word Document v1.0 At handover
  20. E-020 Absence Management Policy
    Word Document v1.0 At handover
  21. E-021 Annual Leave Policy
    Word Document v1.0 At handover
  22. E-022 Maternity Paternity and Parental Leave Policy
    Word Document v1.0 At handover
  23. E-023 Flexible Working Policy
    Word Document v1.0 At handover
  24. E-024 Whistleblowing and Raising Concerns Procedure
    Word Document v1.0 At handover
  25. E-025 Equality Diversity and Inclusion in Employment
    Word Document v1.0 At handover
  26. E-026 Organisational Structure and Staffing Plan
    Word Document v1.0 At handover
  27. E-027 GP Performer List Management
    Word Document v1.0 At handover
  28. E-028 Professional Registration Monitoring
    Word Document v1.0 At handover
  29. E-029 Occupational Health Policy
    Word Document v1.0 At handover
  30. E-030 Staff Wellbeing and Support
    Word Document v1.0 At handover
  31. E-031 Exit Interview and Offboarding Procedure
    Word Document v1.0 At handover
  32. E-032 Volunteer and Work Experience Policy
    Word Document v1.0 At handover

Financial

31 documents · 1 previewable
  1. F-001 Three Year Financial Projections
    Word Document v1.0 Preview
  2. F-002 Monthly Cash Flow Forecast Year 1
    Word Document v1.0 At handover
  3. F-003 Annual Budget Template
    Word Document v1.0 At handover
  4. F-004 Startup Cost Budget
    Word Document v1.0 At handover
  5. F-005 Revenue Model and Assumptions
    Word Document v1.0 At handover
  6. F-006 Banking Pitch Deck Narrative
    Word Document v1.0 At handover
  7. F-007 Break Even Analysis
    Word Document v1.0 At handover
  8. F-008 Sensitivity Analysis
    Word Document v1.0 At handover
  9. F-009 GMS Contract Income Guide
    Word Document v1.0 At handover
  10. F-010 QOF Income Optimisation Plan
    Word Document v1.0 At handover
  11. F-011 Enhanced Services Income Guide
    Word Document v1.0 At handover
  12. F-012 Private Income Schedule
    Word Document v1.0 At handover
  13. F-013 Premises Cost Analysis
    Word Document v1.0 At handover
  14. F-014 Staffing Cost Model
    Word Document v1.0 At handover
  15. F-015 PCN and ARRS Funding Guide
    Word Document v1.0 At handover
  16. F-016 Management Accounts Template
    Word Document v1.0 At handover
  17. F-017 KPI Dashboard Framework
    Word Document v1.0 At handover
  18. F-018 Financial Risk Register
    Word Document v1.0 At handover
  19. F-019 VAT and Tax Guide for GP Practices
    Word Document v1.0 At handover
  20. F-020 GP Partner Drawings and Profit Share Model
    Word Document v1.0 At handover
  21. F-021 Pension and NHS Superannuation Guide
    Word Document v1.0 At handover
  22. F-022 Grant and Funding Opportunities
    Word Document v1.0 At handover
  23. F-023 Financial Policies and Procedures
    Word Document v1.0 At handover
  24. F-024 Year End Accounts Preparation Guide
    Word Document v1.0 At handover
  25. F-025 Business Plan
    Word Document v1.0 At handover
  26. F-Excel-001 Master Financial Model
    Excel Workbook v1.0 At handover
  27. F-Excel-002 Startup Budget
    Excel Workbook v1.0 At handover
  28. F-Excel-003 Management Accounts
    Excel Workbook v1.0 At handover
  29. F-Excel-004 KPI Dashboard
    Excel Workbook v1.0 At handover
  30. F-Excel-005 Income Calculator
    Excel Workbook v1.0 At handover
  31. F-Excel-006 Financial Risk Register
    Excel Workbook v1.0 At handover

Risk & Insurance

15 documents · 1 previewable
  1. G-001 Practice Risk Register
    Word Document v1.0 Preview
  2. G-002 Clinical Risk Assessment Framework
    Word Document v1.0 At handover
  3. G-003 Risk Management Strategy
    Word Document v1.0 At handover
  4. G-004 Insurance Programme Schedule
    Word Document v1.0 At handover
  5. G-005 Broker Briefing Document
    Word Document v1.0 At handover
  6. G-006 Business Continuity Plan
    Word Document v1.0 At handover
  7. G-007 Disaster Recovery Plan
    Word Document v1.0 At handover
  8. G-008 CQC Risk Domain Mapping
    Word Document v1.0 At handover
  9. G-009 Financial Risk Assessment
    Word Document v1.0 At handover
  10. G-010 Premises Risk Assessment
    Word Document v1.0 At handover
  11. G-011 Information Security Risk Assessment
    Word Document v1.0 At handover
  12. G-012 Pandemic and Infectious Disease Response Plan
    Word Document v1.0 At handover
  13. G-013 Resilience and Business Impact Analysis
    Word Document v1.0 At handover
  14. G-014 Medical Indemnity and Clinical Negligence Guide
    Word Document v1.0 At handover
  15. G-015 Annual Risk Review Report Template
    Word Document v1.0 At handover

Marketing & Business Development

15 documents · 1 previewable
  1. H-001 Marketing Strategy
    Word Document v1.0 Preview
  2. H-002 Practice Leaflet and Welcome Pack
    Word Document v1.0 At handover
  3. H-003 NHS Choices and Online Directory Profile
    Word Document v1.0 At handover
  4. H-004 Website Content Plan
    Word Document v1.0 At handover
  5. H-005 Patient Engagement Strategy
    Word Document v1.0 At handover
  6. H-006 Social Media Policy and Content Calendar
    Word Document v1.0 At handover
  7. H-007 Community Health Promotion Plan
    Word Document v1.0 At handover
  8. H-008 Stakeholder Engagement Plan
    Word Document v1.0 At handover
  9. H-009 Patient Survey Framework
    Word Document v1.0 At handover
  10. H-010 Service Development Proposal Template
    Word Document v1.0 At handover
  11. H-011 Referral and Partnership Guide
    Word Document v1.0 At handover
  12. H-012 Annual Report Template
    Word Document v1.0 At handover
  13. H-013 Newsletter and Patient Communication Templates
    Word Document v1.0 At handover
  14. H-014 Press and Media Relations Policy
    Word Document v1.0 At handover
  15. H-015 Brand Guidelines for NHS Context
    Word Document v1.0 At handover

Contracts & Agreements

14 documents · 1 previewable
  1. I-001 GMS Contract Summary and Compliance Guide
    Word Document v1.0 Preview
  2. I-002 APMS Contract Application Framework
    Word Document v1.0 At handover
  3. I-003 Partnership Agreement Template
    Word Document v1.0 At handover
  4. I-004 PCN Network Agreement
    Word Document v1.0 At handover
  5. I-005 Locum GP Service Agreement
    Word Document v1.0 At handover
  6. I-006 Third Party Service Provider Agreement
    Word Document v1.0 At handover
  7. I-007 Data Processing Agreement Template
    Word Document v1.0 At handover
  8. I-008 Premises Lease Heads of Terms
    Word Document v1.0 At handover
  9. I-009 Service Level Agreement Template
    Word Document v1.0 At handover
  10. I-010 Confidentiality Agreement Template
    Word Document v1.0 At handover
  11. I-011 Shared Care Agreement Framework
    Word Document v1.0 At handover
  12. I-012 Practice Merger and Collaboration Framework
    Word Document v1.0 At handover
  13. I-013 Subcontractor Agreement for Enhanced Services
    Word Document v1.0 At handover
  14. I-014 Patient Registration Terms and Conditions
    Word Document v1.0 At handover

Health & Safety

18 documents · 1 previewable
  1. J-001 Health and Safety Policy
    Word Document v1.0 Preview
  2. J-002 Fire Safety Policy and Procedure
    Word Document v1.0 At handover
  3. J-003 Fire Risk Assessment Template
    Word Document v1.0 At handover
  4. J-004 COSHH Assessment and Management
    Word Document v1.0 At handover
  5. J-005 Sharps Safety Policy and Procedure
    Word Document v1.0 At handover
  6. J-006 Clinical Waste Management
    Word Document v1.0 At handover
  7. J-007 Infection Prevention and Control Procedures
    Word Document v1.0 At handover
  8. J-008 Legionella Risk Assessment and Management
    Word Document v1.0 At handover
  9. J-009 Asbestos Management Plan
    Word Document v1.0 At handover
  10. J-010 Display Screen Equipment Assessment
    Word Document v1.0 At handover
  11. J-011 Manual Handling Policy
    Word Document v1.0 At handover
  12. J-012 Accident and Incident Reporting Procedure
    Word Document v1.0 At handover
  13. J-013 First Aid Policy and Equipment
    Word Document v1.0 At handover
  14. J-014 Security Policy and Procedures
    Word Document v1.0 At handover
  15. J-015 Electrical Safety and PAT Testing
    Word Document v1.0 At handover
  16. J-016 Slip Trip and Fall Prevention
    Word Document v1.0 At handover
  17. J-017 Cold Chain and Vaccine Storage Safety
    Word Document v1.0 At handover
  18. J-018 Workplace Stress Risk Assessment
    Word Document v1.0 At handover

Information Governance

20 documents · 1 previewable
  1. K-001 Information Governance Framework
    Word Document v1.0 Preview
  2. K-002 Data Protection Policy (UK GDPR)
    Word Document v1.0 At handover
  3. K-003 Patient Privacy Notice
    Word Document v1.0 At handover
  4. K-004 Staff Privacy Notice
    Word Document v1.0 At handover
  5. K-005 Data Security and Protection Toolkit (DSPT) Compliance Guide
    Word Document v1.0 At handover
  6. K-006 Caldicott Guardian Role and Responsibilities
    Word Document v1.0 At handover
  7. K-007 Clinical Coding Standards and Quality
    Word Document v1.0 At handover
  8. K-008 Subject Access Request (SAR) Procedure
    Word Document v1.0 At handover
  9. K-009 Data Breach Management Procedure
    Word Document v1.0 At handover
  10. K-010 Information Sharing Agreements and Protocols
    Word Document v1.0 At handover
  11. K-011 Records Retention and Destruction Policy
    Word Document v1.0 At handover
  12. K-012 Clinical System Access Control and Audit
    Word Document v1.0 At handover
  13. K-013 NHS Mail and Secure Communications Policy
    Word Document v1.0 At handover
  14. K-014 GP Connect and Interoperability Framework
    Word Document v1.0 At handover
  15. K-015 Cyber Security Policy
    Word Document v1.0 At handover
  16. K-016 Mobile Device and Remote Working Policy
    Word Document v1.0 At handover
  17. K-017 Social Media and Online Presence Policy
    Word Document v1.0 At handover
  18. K-018 Data Protection Impact Assessment (DPIA) Procedure and Template
    Word Document v1.0 At handover
  19. K-019 Consent to Information Sharing
    Word Document v1.0 At handover
  20. K-020 Registration Authority and Smartcard Management
    Word Document v1.0 At handover

Branding & Assets

8 documents · 1 previewable
  1. L-001 Brand Identity Guidelines
    Word Document v1.0 Preview
  2. L-002 Colour Palette Specification
    Word Document v1.0 At handover
  3. L-003 Letterhead Template
    Word Document v1.0 At handover
  4. L-004 Compliments Slip Template
    Word Document v1.0 At handover
  5. L-005 Business Card Template
    Word Document v1.0 At handover
  6. L-006 Email Signature Template
    Word Document v1.0 At handover
  7. L-007 PowerPoint Template Guide
    Word Document v1.0 At handover
  8. L-008 Social Media Asset Specifications
    Word Document v1.0 At handover

The full files are released to the selected operator at handover, after both sides decide to proceed and the operating agreements are signed.

Apply now — £200 onboarding setup fee →